Doors and windows questions, answered plainly
Package pricing, SEAI grant limits, Part L U-values, fire escape windows, trickle vents, colours and VAT in one place.
Free, no obligation. One local installer prices it, not five.
- €5,500–€8,5003-bed semi white uPVC bundle
- Up to €5,600SEAI grant for detached homes
- 1.4 W/m²KPart L whole-unit U-value cap
- 13.5% VATreduced rate on supply and fit
Price my openings
Four quick taps and our Irish price range shows before any contact detail is asked for. One local installer rings you, not five.
A full-house windows and doors package, 8 to 12 openings (3-bed semi size), in uPVC: €6,500 to €10,500, supplied and fitted before any SEAI grant.
How this package estimate is worked out
The range reflects typical supply-and-fit door and window prices in Ireland for that package type, opening count and frame material, assuming existing structural openings and standard removal of old frames. Triple glazing typically adds 10% to 15%, coloured uPVC foil adds 15% to 20%, and widening a rear wall for a wide slider or bifold requires a structural lintel priced separately. Ask for written U-values and 13.5% VAT confirmation. Use this range to budget: only an on-site survey gives a fixed price.
Every question answered
How much does a full-house package cost for a 3-bed semi?
Count on €5,500 to €8,500 for smooth white uPVC, €7,000 to €10,500 for coloured uPVC, €11,500 to €16,800 for aluminium and €13,500 to €19,500 for aluclad, covering 8 to 10 windows plus front and rear doors fitted.
How much does a 4-bed detached house package cost?
With 12 to 16 windows and two to three external doors, expect €8,500 to €12,500 in smooth white uPVC, €10,500 to €15,000 in coloured uPVC, €17,000 to €25,500 in aluminium and €20,000 to €30,000 in aluclad.
What SEAI grants cover windows and external doors?
Pre-2011 homes may qualify for €1,500 (apartment), €1,800 (mid-terrace), €3,000 (semi-D/end-terrace) or €4,000 (detached) for windows, plus €800 per external door up to two doors. doorsandwindows.ie is not SEAI or a government body and does not award grants.
Do I need a One Stop Shop to claim window and door grants?
No longer always. SEAI One Stop Shops deduct grants upfront inside a B2 deep retrofit, while pre-2011 homes whose walls and attic already meet Good or Very Good heat loss can apply via SEAI standalone individual grants.
What is the difference between Uw and Ug U-values?
Ug measures heat loss through the centre of the glass pane only. Uw measures the complete installed window including frame, spacers and glass. Irish Part L and SEAI grants enforce Uw (≤ 1.4 W/m²K).
Is triple glazing worth the extra cost across an entire house?
Upgrading a 3-bed semi from double to triple glazing typically adds €800 to €2,000. It cuts cold glass radiation, lowers street noise and pushes whole-window Uw down to 0.8 to 1.1 W/m²K.
What are the Irish Part B fire-escape window rules?
Every habitable upper-floor room needs an opening sash giving at least 0.33 m² clear unobstructed area, minimum 450 mm width and height, with the bottom edge 800 mm to 1100 mm above the internal floor.
Will new airtight windows cause condensation indoors?
Without planned airflow, sealing old draughts traps kitchen and shower moisture. Fitting Part F trickle vents or running continuous mechanical extraction prevents mould and steaming glass.
Can I match anthracite uPVC windows to a composite front door and aluminium slider?
Yes, if you align RAL 7016 gloss levels and physical colour swatches side by side in daylight before manufacture, because foil, GRP composite paint and powder-coated metal reflect light differently.
How does the 13.5% VAT two-thirds rule work?
Supply-and-fit contracts qualify for 13.5% VAT if the VAT-exclusive cost of frames and glass stays at or below two-thirds of the net job price. Exceeding two-thirds or ordering supply-only puts the entire bill on 23% VAT.
How long do windows and doors take to arrive after measuring?
Allow 3 to 5 weeks for white uPVC, 5 to 7 weeks for coloured foils, 6 to 10 weeks for aluminium and 8 to 12 weeks for aluclad.
Do replacement windows need planning permission in Ireland?
Like-for-like replacements on standard non-protected houses rarely need permission. Protected Structures, Architectural Conservation Areas and creating new or enlarged openings overlooking neighbours require council checks first.
Should airtight tapes be used on a standard retrofit?
Yes, especially on exposed rural sites or homes heading for a heat pump or BER B2 upgrade. Three-layer expanding foam plus internal airtight and external weather-tight tapes outperform bare silicone.
Who contacts me after I submit the planner?
Your outline goes to a single local installer in your county, never to a multi-company lead list.
All doors and windows guides
House packages
Specs & Building Regs

See your house package price before anyone rings
Pick the bundle, opening count and frame material. When you want a measured quote, your outline goes to a single local installer in your county.
